References / Past Performance

Chip McClellan

Vice President, COO

251 947 4848 office

251 622 2703 cell

www.pae.aero

Tom Jarman

Associate Architect

Hatch Mott MacDonald

805 Daphne Avenue

Daphne, Al 36526

T 251.626.5514

F 251.626.7321

thomas.jarman@hatchmott.com

Edward Von Bergen

Caption/ Engineer

Marine Specialist

1-850-712-9243

Betts Corporation, Montgomery, PA

Major renovations including demolition, construction of offices and interiors, cleaning (pressure washing of ceilings and floors), painting interior of facility, relocation of equipment, design/building of mezzanines, trenching, mechanical, plumbing and extensive warehouse renovations for over 40,000 SF of production space. Coordination and planning with the various departments was a major aspect of this project in order to deliver on time/on budget commitments.

Healthcare Properties, Red Bank , NJ

Major renovation of a 30,000 SF historical mansion which was converted into a Senior Center. Renovations included demolition, structural, elevators, sprinkler & fire systems, sewer, electrical (including high voltage), mechanical, HVAC and special finishes.

Brynmawr Stereo, King of Prussia, PA

As the Design/Build Contractor in collaboration with Architects and Engineers, complete services were provided for six stores. Each project consisted of structural, mechanical, electrical, HVAC, fire sprinkler systems and special interior finishes. The building exteriors included paving of customer parking area, tunneling under a four lane highway to connect lateral to main sewer line, constructing new entrance/exit from deceleration lane and landscaping.

Levi’s Store Tanger Outlet Center

  • Demolition
  • Framing / Drywall /Plywood
  • Acoustical Ceiling
  • Bathroom Flooring
  • Painting
  • Fixture Package

US Post Office, Mobile, AL

The work shall consist of Repairing and Selective Replacements of the Existing Dock Bumpers and associated work.  Restore adjacent surfaces affected by this work to like-new condition. Perform work in accordance with applicable codes, local ordinances, or industry standards, whichever is more stringent. Contractor shall guarantee workmanship and materials for one year from date of acceptance.

Foley Middle School Demolition

  • Removed 80,00 sq of middle school
  • Second project and remove about 100,00 sq of building